Prepared for your department

Give your department back 353 hours a year.

That's the supervisor time Atlas Insight could free up from daily inspection assignment — no new hires, no new permitting system.

Lasso-select inspections in Atlas Insight
94%

Polk County's reduction in daily assignment time. Estimate above assumes ~1.5 supervisor hrs/day for a 20-inspector team.

Three moves. Whole day planned.

1

Lasso

Draw around inspections on the map. Drop them on an inspector.

2

Auto-assign

Your rules, one click. Workloads balance themselves.

3

Adapt

Someone's out? Their whole day moves in seconds.

Atlas Insight workload view

Works with what your department already runs.

Atlas Insight sits on top of your permitting system as a supervisor layer. No rip-and-replace, no retraining your inspectors.

  • ✓Live workload & capacity view
  • ✓Map-based routing and emergency dispatch
  • ✓Hours and activity reporting

Let's map your department's numbers.

20 minutes. We'll walk your real inspection mix and size the time savings.

20 minutes. Your data, your workflows. No pressure.

VersionABCD